When Standard Prefab Showers Fall Short of What You Need

Custom Tile Shower Design and Installation in Richmond, Vermont and Surrounding Areas

Pelletier Contracting LLC builds fully custom tile showers for homeowners in Richmond, Stowe, St. Albans and neighboring communities who need layouts that accommodate specific dimensions, built-in seating, multiple showerheads, or storage niches that prefabricated units cannot provide. This service involves detailed planning of tile patterns, waterproofing system installation to industry standards, coordination of glass enclosure measurements, and finish work that integrates benches, shelving, and trim into a watertight assembly. These showers are designed to handle Vermont's fluctuating indoor humidity without compromising grout joints or allowing water migration behind wall surfaces.


The process begins with measurements of the existing or planned shower footprint, discussion of tile size and layout, and decisions about niche placement, bench height, and drain type. A sloped mortar bed or prefabricated shower pan is installed over a waterproofing membrane that extends up the walls to a height above the showerhead. Cement backer board is fastened to studs, seams are taped and waterproofed, and tile is set in thin-set mortar with careful attention to grout joint width and alignment. Corners and transitions receive caulk rather than grout to allow for slight movement without cracking.


If your bathroom remodel includes a shower that needs to fit an alcove, wrap a corner, or include a built-in seat, reach out to discuss custom tile options in the Richmond area.

What You Will See After Installation Is Complete

You will notice that water stays contained within the shower enclosure, tile corners align without lippage, and recessed niches are flush with surrounding tile surfaces. Grout lines are consistent in width and color, and all penetrations for valves, showerheads, and handheld mounts are sealed with escutcheons that sit flat against the tile. Benches are sloped slightly toward the drain to prevent standing water, and glass enclosures are measured to clear tile edges without gaps that allow spray to escape.


Pelletier Contracting LLC completes the work by sealing grout joints with a penetrating sealer that resists staining and moisture intrusion. Caulk is applied at all changes of plane, including floor-to-wall transitions, inside corners, and fixture flanges. You receive guidance on curing time before full use, typically 72 hours for grout and 24 hours for caulk, and recommendations for ongoing maintenance to preserve the waterproofing system.


The final result is a shower that drains completely without pooling, maintains grout integrity under daily use, and supports the weight of wall-mounted fixtures without flexing. Vermont winters bring dry indoor air followed by spring humidity, and properly installed tile systems manage those swings without cracking or delaminating. Pelletier Contracting LLC uses materials rated for wet environments and follows substrate preparation methods that prevent future failures.

Common Questions About Custom Tile Shower Projects

Here are answers to questions that come up during planning and installation.

How long does it take to build a custom tile shower from start to finish?

Most installations require one to two weeks depending on the size, complexity of tile layout, and whether the space needs structural modifications before waterproofing begins.

What type of waterproofing system do you use?

A combination of sheet membranes or liquid-applied barriers is installed under cement backer board and over the shower pan, with seams and corners reinforced according to manufacturer specifications.

Can a bench or niche be added to an existing shower footprint?

Yes, as long as framing supports the load and waterproofing extends into the new structure. Benches are typically built from foam or mortar and covered with the same tile as the walls.

Why does Vermont humidity matter for tile showers?

Fluctuating indoor moisture levels can cause grout and caulk to crack if substrates are not properly prepared. Sealed grout joints and adequate ventilation help maintain long-term durability.

Do you provide glass enclosure installation?

Pelletier Contracting LLC coordinates glass measurements after tile is set and cured, ensuring that door clearances and hinge placements align with the finished tile surface.

If your bathroom needs a shower built to specific dimensions or design requirements, contact Pelletier Contracting LLC in Richmond to discuss tile options, waterproofing methods, and project timelines tailored to your space.